-
Typhoon Dujuan leaves four dead in Japan, 45,000 houses without power
-
Swimming prodigy Yu, 13, says 'interviews way harder than racing'
-
G7 leaders condemn Houthi strikes on Saudi Arabia
-
Star coaches make their bows as Nations League returns
-
Google data centre sparks protests in Austria
-
Rams bounce back as Giants reel from Dart injury
-
Shin Ohashi: Junk food-loving teen and Japan's next big swimming hope
-
In Bangladesh, Pakistan's Jinnah photo stirs anger
-
Stocks rise on AI buzz, drop in oil prices
-
Two New Zealand naval ships transit Taiwan Strait
-
China's robot dancers limber up for America's Got Talent final
-
Zidane gets down to work as France start new era
-
Despite military might, Saudi struggles to crush the Houthis
-
Inside the Venezuelan prison meant to 'drive you insane'
-
Trump to tout deals, defend Iran war in UN speech
-
UK king braces as memoir by Diana's brother goes on sale
-
Sri Lanka to issue verdict in landmark Easter attack trial
-
Akkodis and Hamburg Public Transport Association Showcase hvv mia at InnoTrans 2026, Demonstrating the Future of AI-Powered Mobility
-
No green light to lift EU sanctions on Russian oligarchs, talks to resume
-
Macron says talks with Trump on Red Sea, Ukraine 'constructive'
-
UK agrees support for Saudi in struggle with Houthis: reports
-
Green policies just good politics, says UK minister
-
EU foreign policy chief calls for continued sanctions on Russia
-
Bardot auction in Paris fetches nearly one million euros
-
Flights scrapped, evacuations urged as Typhoon Dujuan wallops Japan
-
No timeline on Daniels injury return, says Commanders coach
-
Fonseca to take break from tennis
-
British Columbia sues OpenAI in US court over Canada school shooting
-
A Cuban zoo, and its animals, in epic battle for survival
-
French star Batum retires after 18-year NBA career
-
Infantino proposes consulting federations to reform FIFA
-
Zidane leads first France training session
-
El Nino weather pattern enters record territory: scientist
-
Man shot by ICE agent in Texas detained with bullet inside him: lawyer
-
OpenAI calls for US to lead global effort on AI standards
-
California declares state of emergency ahead of El Nino
-
South African ostriches plucked alive for luxury fashion: report
-
South Africa arrests three more suspects, after nine women murdered
-
US networks halt Trump coverage in revolt over White House ban
-
Carse needs time away from England, says captain Brook
-
Paramount settles with US states to clear Warner Bros. mega-merger
-
NOWPayments Releases Cross-Chain Payout Data Revealing Key Performance Benchmarks Across TRON, BNB Chain, and Solana
-
Climate crisis a job for world leaders, not just activists: UK FM
-
British Museum bans photos of Bayeux Tapestry as crowds linger
-
US networks halt Trump coverage over White House ban
-
COP31 host says AI climate footprint to be a summit priority
-
French singer accuses Miley Cyrus of plagiarism
-
Berlin's far-left vote winners reject anti-semitism charges
-
EU fines Google 403 mn euros for location data breach
-
Mancini eager for 'new adventure' on Italy return
Polaris Renewable Energy Announces Approval of SO1 Agreement by PREPA
TORONTO, ON / ACCESS Newswire / March 2, 2026 / Polaris Renewable Energy Inc. (TSX:PIF) ("Polaris" or the "Company"), is pleased to announce that, at a meeting held on February 19, 2026, the Governing Board of the Puerto Rico Electric Power Authority ("PREPA") approved the Battery Energy Storage System Standard Offer Agreement ("SO1 Agreement"). The Company received formal written notice of approval on February 27, 2026.
The execution of the SO1 Agreement between PREPA and Polaris Power US, Inc. ("PPUS"), a wholly owned subsidiary of Polaris, remains subject to the approval of the Financial Oversight & Management Board (FOMB) of Puerto Rico, which constitutes the next required step in the process. The Company remains optimistic that the FOMB review and authorization will progress in a timely manner relative to prior regulatory milestones achieved for this project.
The SO1 Agreement forms part of the Puerto Rico Accelerated Storage Addition Program ("ASAP"), a strategic initiative aimed at strengthening grid reliability across the island through the deployment of utility-scale battery energy storage systems ("BESS") co-located with existing generation facilities.
Under this framework, PPUS will act as the "Resource Provider" responsible for the installation and operation of the BESS, while Punta Lima Wind Farm, LLC ("PLWF"), another subsidiary of Polaris, will continue to serve as the "Generation Facility Owner" for the Punta Lima site where the storage system will be located.
Once the BESS project is constructed and fully operational, the Resource Provider will be entitled to receive monthly fixed and performance-based payments from PREPA in exchange for providing energy storage services, including capacity and grid support. The SO1 Agreement has a BESS capacity of 71.4 MW's (35.7 MW's x 2). The Commercial Operation date is forecast to begin twelve months after execution of the Final SO1 Agreement, running for a 20-year term from the Commercial Operation date.
Marc Murnaghan, CEO of Polaris, commented:
"The PREPA Governing Board's authorization of the SO1 Agreement marks an important step forward in the development of our battery energy storage initiatives in Puerto Rico. This project further reinforces our commitment to enhancing grid reliability on the island while building on the strategic value of our existing Punta Lima asset."
Polaris remains committed to delivering long-term, sustainable energy solutions across Latin America and the Caribbean and looks forward to working with all stakeholders throughout the approval and implementation process.
About Polaris Renewable Energy Inc.
Polaris Renewable Energy Inc. is a Canadian publicly traded company engaged in the acquisition, development, and operation of renewable energy projects in Latin America and the Caribbean. We are a high-performing and financially sound contributor to the energy transition.
The Company's portfolio includes a geothermal plant (~82 MW), four run-of river hydroelectric plants (~39 MW), three solar (photovoltaic) projects (~35 MW) and an onshore wind park (~26 MW).
For more information, contact:
Investor Relations
Polaris Renewable Energy Inc.
Phone: +1 647-245-7199
Email: [email protected]
Cautionary Statements
This press release contains certain "forward-looking information" which may include, but is not limited to, statements with respect to future events or future performance, the expected use of proceeds or rating(s) of any such issuance, the Company's acquisition and other investment plans, any benefits to the Company's financial or business performance, the settlement date of the bonds and the listing of the bonds on the Oslo Alternative Bond Market. Such forward-looking information reflects management's current beliefs and is based on information currently available to management. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "predicts", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. A number of known and unknown risks, uncertainties and other factors may cause the actual results or performance to materially differ from any future results or performance expressed or implied by the forward-looking information. Such factors include, among others, the ability of the Company to satisfy any interest payments, which may be affected by such factors as general business, economic, competitive, political and social uncertainties; the actual results of current geothermal, solar and hydro energy production, development and/or exploration activities and the accuracy of probability simulations prepared to predict prospective geothermal resources; changes in project parameters as plans continue to be refined; possible variations of production rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the geothermal and hydro power industries; political instability or insurrection or war; labour force availability and turnover; delays in obtaining governmental approvals or in the completion of development or construction activities, or in the commencement of operations; the ability of the Company to continue as a going concern and general economic conditions, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form. These factors should be considered carefully and readers of this press release should not place undue reliance on forward-looking information.
Although the forward-looking information contained in this press release is based upon what management believes to be reasonable assumptions, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The information in this press release, including such forward-looking information, is made as of the date of this press release and, other than as required by applicable securities laws, Polaris assumes no obligation to update or revise such information to reflect new events or circumstances.
SOURCE: Polaris Renewable Energy Inc.
View the original press release on ACCESS Newswire
J.Horn--BTB